Process Flow and Structure of Polyurethane Caster
With the passage of time, polyurethane castor products on the PU Castor Wheels market have gradually increased. This may also be the market demand to adapt to customers with different needs. Whether it is now or before, whether it is a new product or an old product, the production process of its polyurethane casters is the same. Polyurethane casters are generally divided into two parts, plastic and hardware, and these two parts have their own different production processes. 1. Injection molding part Drying material-blanking-injection molding-wheel out-trimming-cooling-bearing 2. Hardware part Embryo-profiling-drilling-forming-out (heat treatment-electroplating) After the two parts are completed, they will enter the assembly workshop for assembly, packing and storage. So far, the production of polyurethane casters is complete! PU Castor Wheels for forklift can be called directional polyurethane casters and universal polyurethane casters. The directional polyurethane caster bracket